Net Metering Guidance in Peshawar — Reduce Your Bill Further

Net metering lets you export extra solar units to the grid (where eligible). We provide guidance on eligibility, documents, and system alignment for PESCO net metering.

Eligibility guidance • Document support • System alignment • PESCO process guidance

PESCO eligibility guidance
Document checklist support
System alignment for net metering
Post-connection guidance
Net Metering Overview

Turn your meter backwards & zero your bill

Net metering allows you to export excess solar energy to the grid. PESCO credits these units against your consumption, often reducing your bill to zero or creating a credit.

We handle the entire regulatory process, from application to the "Green Meter" installation.

Check Eligibility
Paperwork Issues

Common Hurdles

  • Complex PESCO documentation
  • Long processing delays & follow-ups
  • Application rejections due to errors
  • Technical system misalignment
  • Difficulty finding licensed installers
Get Full Support
Eligible Users

Who Qualifies?

✅ Likely eligible

  • 3-Phase meter owners (or upgrading)
  • System size > 5kW (typically)
  • Property owners with clear documents
  • Installations meeting NEPRA standards

⚠️ Not eligible if

  • Single phase (must upgrade)
  • Rented property without NOC
  • Shared/sub-meter connection
Verify My Meter
Service Scope

Shinwari Net Metering Service

Eligibility & meter check
File preparation & NEPRA licensing
Demand note generation support
Bidirectional meter purchase assistance
Inspection & Green Meter activation
Lifetime monitoring setup
Start Application

Net Metering Process (Step-by-Step)

Eligibility Check

We check your meter type, connection category, and utility area to confirm if net metering is feasible.

Document Preparation

We provide a checklist of required documents: CNIC, electricity bill, property ownership proof, etc.

System Design Alignment

Your solar system is designed (or verified) to meet net metering technical requirements.

Application Submission

Application is submitted to PESCO/NEPRA with all required documents and system specifications.

Inspection & Approval

PESCO conducts a site inspection. After approval, a bidirectional meter is installed.

Activation & Monitoring

Net metering goes live. We guide you on monitoring your export units and bill adjustments.

Documents Typically Required for Net Metering

Requirements may vary. We provide a complete checklist based on your specific case.

  • Copy of CNIC (meter owner)
  • Latest electricity bill
  • Property ownership or NOC document
  • Solar system specifications and single-line diagram
  • NEPRA Generation License application (for larger systems)
  • Inverter and panel certifications (we provide from genuine equipment)
Get Full Checklist on WhatsApp

Net Metering Success Stories

Real people in Peshawar enjoying zero bills and export credits.

Zero Bill Net Metering
Residential

Zero Bill Achieved

Hayatabad homeowner reducing summer bills from Rs. 45,000 to negative credit (-Rs. 3,500).

Hayatabad, Peshawar
Commercial Net Metering
Commercial

Factory Grid Export

Industrial unit exporting surplus units on Sundays and holidays, offsetting peak hour charges.

Industrial Estate, Peshawar
Green Meter Installation
Process

Fast Meter Installation

Completed PESCO green meter installation and commissioning within record time.

University Road, Peshawar
Check Your Eligibility

Savings depend on your system size, energy production, and consumption pattern. In many cases, net metering can reduce bills by 70-90% or more.

It varies depending on PESCO processing times. Typically the process can take several weeks after application submission.

Net metering provides credit adjustment, not direct selling. Excess units are offset against your consumption in the billing cycle.